From: route@monster.com
Sent: Friday, April 29, 2016 3:31 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Gary W. Turner 1900
Judson Road, Longview, TX 75605 214.773.3499turnips4@msn.com TELECOMMUNICATIONS
ENGINEERING Profile Ø Long-term telecommunications,
staff training and project management background. Ø Extensive drafting,
quality control, documentation and procurement experience. Ø B.S. in Industrial
Technology. Ø Record of
progression to assignments of increasing authority and responsibility. Ø Expertise in
critical assignments covering span, fiber and service ID. Ø Coordinate
effectively with operational Project Managers to achieve organizational
objectives on a timely basis. Ø Adept in
verification/finalization of critical operational documentation. Ø Well-organized with
superior detail orientation. Ø Proficiency with
AutoCAD, Microstation, MapInfo, Remedy, Microsoft Office, Visio, SmallWorld
and Google Earth applications. Professional Experience Zayo2012 – Present Fiber Engineer ·
Design routes
for fiber-based services including Point to point, Ring, and path diverse
routing ·
Researches
existing databases, files, and records for purposes of network design,
optimization and relocation of fiber facilities ·
Estimates and
provides design schematics of path, distances and quantity of splicing work
to be performed for fiber projects, relocation of existing fiber facilities
and restoration of existing traffic ·
Ensures fiber
optic database is current and accurate by inputting data regarding location
of fibers and fiber enclosures into the data management system ·
Ensures
inventory of fiber circuits is accurate by inputting data into inventory
management data base and maintaining information as changes occur ·
Establishes and
maintains effective communications and professional working relationships
with customers and internal personnel ·
Organizes
workday efficiently to maximize productivity by utilizing proper time
management techniques
AboveNet, Inc2000 – 2012 Sr. Fiber Engineer ·
Recruited to
serve as original member of 1st Engineering Services Dallas team with continually
expanding responsibilities. ·
Have played
key role in process re-design of project management from initiation to customer
delivery with strong focus on upgraded engineering and documentation. ·
Effectively
initiate Bills Of Material (BOMs), Design Layout Records (DLRs), Splice
Engineering Packages (SEPs), Patch Assignment Tables (PATs) and Network
Diagrams (NDs) for operational Project Managers. ·
Configure
span, fiber, service identification and port assignments in Remedy and draft
bills of material/design layout records for service orders. Gary W. Turner Page Two ·
Submit
engineering documents to OSP Operations, perform requested changes and
analyze fiber traces. ·
Disseminate
CFA/LOA’s (Connecting Facility Assignment & Letter of Authorization) for
customers, draft delivery documents and finalize paperwork. ·
Serve as
Primary SmallWorld LNI Builder for Central Region, primary contact for team
and trainer of staff members. ·
Have
successfully performed in the following markets - Chicago, Dallas, Houston,
Austin, Seattle, Portland, San Francisco, Los Angeles, Denver, Boston,
Atlanta, Salt Lake City, Kansas City & Toronto. MCI WorldCom, Richardson, TX1995 – 2000 Implementation Engineer ·
Scheduled
splicing operations for projects and submitted costs to appropriate Project
Managers. ·
Procured/shipped
materials & equipment and turned in drawings for approval. ·
Reviewed and cataloged
fiber traces, assignments & jobs. ·
Engineered,
designed and priced custom network solutions while coordinating with Sales
Department. ·
Drafted maps
of customer locations & communications routes for pricing purposes. ·
Collaborated
with Outside Plant Engineering to develop fiber communications systems. MetroStaff, Inc., Richardson, TX1995 Quality Assurance/Engineering Drafter ·
Produced
construction drawings with Microstation and efficiently executed thorough
quality control checks. Mellon-Stuart Cable & Construction,
Dallas, TX1993 – 1995 Engineering Drafter ·
Drafted
engineering plans for U.S. Air Force projects on AutoCAD; documented all
operations. Earlier Background From 1985-1993, served as a Mechanical
Design Engineer employed by E-Systems Garland Division (Raytheon) developing
prototype PCB testing equipment, upgrading systems from program initiation to
completion, established positive relations with manufacturing teams,
coordinating with Quality Assurance, Manufacturing, Engineering &
Planning departments, documenting design work and communicating with
customers. During 1985, was a Machinist with Madeira
Air Supply and from 1981-1984 was a Machinist for Richcolor Systems,
Inc. Education Texas A&M
University, Commerce, TX Bachelor of
Science, Major-Industrial Technology Minor-Agriculture, 1984 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|